AGI BIM FIRESTOP WORKFLOW

The BIM Firestop Workflow with Fire Protection Software describes how we structure our BIM process to best support you in your structural fire protection planning process and provide you with the relevant data in the form of Building Information Modelling at the right time. Are you currently planning a BIM project and would like to know more about how we can support you in your specific project phase? Then don't hesitate to contact us.

 

  1. Checklist Phase
  2. Quotation Phase
  3. engineering phase
  4. Solutions Phase

AGI macht's

Checklist Phase Icon AGI BIM FIRESTOP Building Information Modeling Brandschutz AGI AG

1. CHECKLIST PHASE

«Performing a check based on the required information in BIM»

In the "Checklist Phase" you send the Architectural, Structural, Mechanical and Electrical Building Information Models to AGI. We prefer Revit files, but can also work with IFC files. In this phase, we perform a check based on the present information in your BIM and process the missing information in a clear "Checklist". The check is based on the "playing rules" described in our "Infographic Subsequently, you send this Checklist to the General Contractor and MEP (sub)contractor(s) and further discuss the BIM design workflow by providing a project specific presentation. It is important to process the missing information in BIM – as indicated by our Checklist – to ensure an optimal functionality of the Orange Button® BIM firestop design software. The responsibility of processing the correct and complete information in BIM lies with the designing parties.

 

Checklist Phase AGI BIM FIRESTOP Building Information Modeling Brandschutz AGI AG
Quotation Phase Icon AGI BIM FIRESTOP Building Information Modeling Brandschutz AGI AG

2. QUOTATION PHASE

"Determining design and construction costs"

In the "Quotation Phase" we send you a quotation for the complete BIM firestop design. Furthermore, you receive an IFC file and an excel file with a detailed list of all unique "clashes" in BIM with approved firestop solutions. Every unique "clash" represents a unique installation penetrating a fire-separating element. The total amount of "clashes" – specified as unique 3D logos in BIM – is directly related to the total cost of the BIM firestop design.

Quotation Phase AGI BIM FIRESTOP Building Information Modeling Brandschutz AGI AG
Engineering Phase Icon AGI BIM FIRESTOP Building Information Modeling Brandschutz AGI AG

3. ENGINEERING PHASE

"More than just the push of an ORANGE BUTTON®"

In the "Engineering Phase", all "clashes" – specified as unique 3D logos in BIM – are converted into BIM firestop solutions, using the Orange Button® BIM software. In this phase, it is also possible to generate the BIM firestop design in several different phases by using the "Scope Box" feature in Autodesk Revit. We further subdivided our "Engineering Phase" into an "Advice & Remarks Phase" and a "Modify Phase".
In the "Advice & Remarks Phase", we check the optimized BIM firestop design that the Orange Button® software automatically generated. Remarks are processed manually, when – for example – a particular fire damper type is designed in a particular wall in BIM, that is insufficiently thick or incorrectly assembled and therefore can't be sealed with a certified firestop.
In the "Modify Phase", the General Contractor and MEP (sub)contractor(s) get the chance to deliberate and – in due time – change and process the remarks as derived from the previous "Advice & Remarks Phase".

Engineering Phase AGI BIM FIRESTOP Building Information Modeling Brandschutz AGI AG
Solutions Phase Icon AGI BIM FIRESTOP Building Information Modeling Brandschutz AGI AG

4. SOLUTIONS PHASE

"Producing final solutions in BIM"

In the "Solutions", we finalize the BIM firestop design. All final firestop solutions and integrated advices are sent in .IFC and .RVT files. These final firestop solutions and files can be sent completely, per construction phase or for specific parts of the project. This is completely dependent on the design and engineering process of our client. Just like the phased completion of a project on the construction site, we are also able to digitally complete a project in different phases by using the Orange Button® BIM firestop design software!
Are you currently working on a BIM project and would you like to receive some additional information about the possibility of the phased digital completion of a BIM firestop design? Then, do not hesitate to contact us!

Solutions Phase AGI BIM FIRESTOP Building Information Modeling Brandschutz AGI AG

AGI MACHT'S - FULL SERVICE

The construction of high-quality firestop solutions is one of our core competences!

In every project we support in firestop planning or tendering, we study in detail the specific conditions, challenges and the best approaches. We would like to use this knowledge to guarantee you the highest level of quality both in the execution of the firestop systems and all other structural fire protection solutions. With AGI BIM Firestop, we can offer you the realisation of the firestop design throughout the entire construction process - from the planning stage, through professional installation on site, to facility management, always with the aim of making your buildings safer and protecting your investments.

Manage cookie consent
This website uses technologies such as cookies to enable certain features, improve usability and offerings, and measure and improve website performance. If you do not give or withdraw your consent, certain features and functions may be affected.
Functional
Always active
The functional technologies are required to ensure the core functionality and basic user experience of the website.